The LandTek Group completed construction of the Knight Riders Cricket Field at Fairplex in Pomona, California, a purpose‑built stadium designed to support professional cricket and international competition. Located within the 487‑acre Fairplex campus, the project introduces a dedicated cricket venue within a major public events and entertainment destination.
The facility was designed to accommodate professional‑level match play, team training, and large‑scale events, providing long‑term operational flexibility for a range of uses. Central to the project is a natural grass cricket pitch constructed with a specialized clay soil profile engineered to meet the performance standards required for elite competition. Field systems and supporting infrastructure were developed to ensure consistent playability, durability, and reliability under demanding conditions.
The completed stadium establishes Los Angeles as a permanent market within Major League Cricket and supports the continued growth of the sport in the United States. The venue is also positioned to support international events, reinforcing its role as a high‑performance facility within one of the country’s leading sports markets.
The LandTek Group completed construction of the Nassau County International Cricket Stadium at Eisenhower Park, delivering a temporary venue designed to host major international competition. The scope included construction of the professional grass stadium pitch, a surrounding synthetic turf perimeter, and significant site civil work. LandTek also developed a supporting training facility at nearby Cantiague Park.
The project centered on the delivery of high‑performance cricket pitches, requiring specialized design, material selection, and installation techniques. Due to regional climate limitations, the pitches were cultivated off‑site and transported as drop‑in systems, requiring complex coordination, fabrication, and logistics. LandTek partnered with industry specialists to ensure the playing surfaces met international performance standards.
Substantial planning and execution were required to transport and install multiple pitch sections, while maintaining soil integrity and turf health throughout transit. The completed field system delivers a competition‑ready surface capable of supporting international‑level play under demanding conditions.
This project involved the rapid design and construction of a professional soccer training facility for the new MLS expansion team, Inter Miami CF. We were brought on as part of the project team to undertake the ambitious task of developing a high-end training facility across a 60-acre complex within a 1½-year timeframe. The project was successfully completed and has been in operation since March 2020.
Our involvement began with the design of the fields, which included addressing elevation constraints, specialized drainage, underground infrastructure requirements, and coordinating work among multiple contractors while effectively phasing each task. The design comprised four natural grass pitches for academy teams, two professional pitches, a synthetic pitch, and a stadium pitch.
Once our design was integrated into the project drawings, we coordinated our activities with the team ownership and the construction manager/general contractor (Moss) appointed to oversee the project. The pitches were surrounded by concrete walkways, landscaping, and essential site infrastructure. We also managed all activities interfacing with the fields, including the installation of specialized underdrain systems, growing media, irrigation systems, and laser grading. Each task was meticulously sequenced to align with surrounding work, emphasizing the importance of logistical coordination.
Constructing the natural grass pitches while the overall project was underway was crucial, as the grass needed time to establish a strong root structure for optimal performance and safety. Typically, the installation of fields occurs towards the end of projects of this scale; however, due to the tight timeline, we executed this work concurrently. Additionally, we handled the installation of customized netting systems and sports lighting.
We successfully completed the installation of the pitches, the synthetic turf field, and all related sports infrastructure. We also managed the development and maintenance of the natural grass fields, utilizing temporary systems until the complex was fully finalized. Our ability to mobilize a trained workforce from our other project locations enabled us to complete this complex project ahead of schedule.
The LandTek Group® is proud to be a part of this historic reconstruction of the Memorial Stadium in Mount Vernon. The 8-acre athletic complex required extensive site work and infrastructure upgrades since its closure in 2010. Over 100,000 cubic yards of material was moved, including extensive rock hammering, retaining walls and the installation of piles to support the grandstands. The rebuilt facility includes the installation of a FieldTurf multi-sport synthetic field based on professional play specifications. The stadium field is surrounded by an eight-lane high-end competitive running track ready to host national track and field events. A new 3,900-seat grandstand with a custom press box was erected. Beneath the stands are four buildings that have locker rooms, bathrooms, and mechanical space. Surrounding the grandstands are additional buildings that house ticket sales and concessions. A high-end sound system and video board from Daktronics completes the upgraded sports experience. The complex also includes one of the largest skate parks in NY that has already started a following on social media. Along the northern edge of the site there are three new clay tennis courts.
Monsignor McClancy High School’s new 127,600 SQ.FT sports complex was a design-build by The LandTek Group®. The Turnkey construction of the Stephen J. Squeri Sports Complex in Queens, NY included the conversion of the baseball field and softball field to synthetic turf. LandTek installed new drainage and stormwater management along with new perimeter fencing, backstops and dugouts. Inlaid lines for soccer along with a synthetic running track were included in the complex. The project was finished with concrete walking paths and a new scoreboard.