SUNY Maritime’s new 101,000 sq. ft. synthetic turf baseball field overlooks the Manhattan skyline from the Bronx campus. The LandTek Group® converted the natural baseball field to synthetic turf. The new turf covers both the outfield and infield. LandTek also constructed a new perimeter ball-stop netting system, a new backstop, and chain-link perimeter fencing. The project was complete with a new flagpole, foul poles, and installation of a Musco lighting system.
Home of the Copiague Youth League, Tanner park recently received an upgrade to their Little League baseball fields. All four infields were converted from natural clay and grass to Field Turf’s state-of-the-art artificial turf. LandTek self-performed all site work, excavation, drainage, and installation of 36,000 sq. ft. of synthetic turf. Additional scope of work included new perimeter fencing, concrete walkways that connect all four fields, landscape sodding, and new foul poles.
This ground-up construction included 6 tennis courts, an outdoor roller rink, synthetic multipurpose soccer, and lacrosse field, a full-sized synthetic baseball field with a regulation soccer field within the outfield, and a brand new synthetic multipurpose field for football, soccer, lacrosse, and field hockey, and a 6 lane running track. The scope included new concrete walkways, archways, and a new brick concession stand.
“Every last thing, if there was a question or concern, LandTek addressed it. They take a tremendous amount of pride in what they do. There is no company I’d rather work with than LandTek.” John Dolan: Superintendent of Schools
East Islip, NY
The LandTek Group® recently completed a conversion of a natural field to a multipurpose synthetic turf field for the Village of Lynbrook, New York. The scope of work included excavation, laser grading, and adding a new drainage system. LandTek installed 98,000 sq.ft of new synthetic turf and added new fencing, dugouts, and concrete walkways. The new multipurpose synthetic turf field includes playable areas for football, soccer, lacrosse, and baseball. A new state-of-the-art Musco lighting system was also included.
Completed in 2014, Temple University now has a new truly state of the art Division 1 level football practice complex that allows them to compete and attract top level talent. The newly renovated facility contains a synthetic turf football field, dedicated only for the NCAA Division I Football team’s practices and workouts.
This project presented a number of unique and unexpected challenges due to its urban location, local authorities/requirements and design enhancements which were added and performed during the construction process. Much of the work was delicate in nature so as to preserve the myriad of existing underground municipal utilities.
The old existing turf and drainage mat were removed along with the export of the entire existing stone base and an extensive amount of old historic construction fill. This enabled LandTek to lower the existing subgrade to accommodate the new modern underground detention and drainage system, designed to meet the new stringent municipal storm water regulations. The system was designed to tie into and work in unison with the City of Philadelphia’s storm water system.
The project for Connetquot High School includes turf conversion of two new baseball and two new softball fields. Between the four fields, over 79,000 Sq.ft of synthetic turf infield was installed. Overall improvements include new perimeter fencing and chain link backstops installed on each field. The work also covered laser grading the fields and a new drainage system.