East Meadow Union Free School District recently received two new synthetic turf fields. East Meadow HS and WT Clark HS both had their stadium football fields converted from natural grass to state of the art artificial turf. Together LandTek installed over 180,000 sq.ft of synthetic turf. Both fields underwent extensive excavation and removal of the existing natural grass. LandTek then installed new custom drainage systems. New perimeter chain-link athletic fencing was added to protect the new facilities along with new concrete walkways. In addition to a new field East Meadow High School also received a resurface to their 6 lane running track.
The LandTek Group® recently resurfaced Rutgers University’s 84,000 sq.ft. Marco Battaglia Practice Complex. LandTek removed the old turf field, reconstructed a base and installed a new synthetic turf surface.
Pope John XXIII Regional High School in Sussex, NJ recently upgraded their multipurpose field. LandTek replaced 95,000 sq.ft of synthetic turf. The new multipurpose synthetic field includes inlaid lines for Football, Soccer, Boys & Girls Lacrosse and Field Hockey. The large field also includes a 90’ baseball field. New colored endzones and center logo were also added.
Over the past year, The LandTek Group® was hard at work renovating Robert Moses Middle School’s athletic facility. The area was tilled, laser graded, and fitted with new natural grass sod. The area consists of a renovated softball field, baseball field, two soccer fields, and a football field. New chain-link athletic fencing, backstops, and dugouts were constructed. The existing 6 lane running track was re-surfaced and painted a bright blue. New asphalt walking paths surround the facility interconnecting all the fields.
This publicly bid project was completed in 2018 and provided the Littlestown School District and community with a much-needed state of the art high school multipurpose sports stadium.
The project involved final cleanup of the elementary school demolition and site preparation needed to allow The LandTek Group® to begin the turnkey transformation into a showcase sports facility. Project consisted of a new competition multi-sport synthetic turf field, Musco sports lighting, decorative stone veneer concession/bathroom/locker room/ticket booths, home and away bleachers with press box and parking facilities. The unique entrance way is surrounded by a decorative fence with stone veneer columns and sitting walls enhanced by lighted paver walkways and an impressive, suspended Thunderbolt airplane representing the districts mascot.
In 2018, LandTek replaced the all-purpose football field at Poly Prep High School. More recently, LandTek converted the natural grass baseball and softball fields to synthetic turf. The new baseball field, designed to resemble a minor league stadium, seats 350 people, while the softball field offers a stadium feel with seating for 150 people.
The baseball team, ranked number one in New York State, consistently produces high-level college players. This multipurpose complex, which also hosts soccer games, sits in the shadows of the Verrazano Bridge. Construction commenced in October of 2021 and was complete prior to the start of baseball season in April of 2022.
Temple University, as a state related public research university, bid this new NCAA Division I state of the art multisport complex to be located on the site of the former Wm. Penn High School. This new multisport facility houses the track, soccer, lacrosse and field hockey programs. The Broad Street complex was completed in 2016.
The project involved substantial earthwork along with an extensive underground storm water management system for the synthetic turf soccer field and a porous asphalt base with in-ground irrigation for the synthetic turf field hockey field. Project also included the installation of a ball stopper safety netting system.
This publicly bid project involved the conversion of an existing natural grass stadium field to a new synthetic turf surface. Construction was accomplished under a very aggressive schedule during peak summer vacation/seasonal tourism season which made getting materials, manpower and equipment delivered to this barrier island resort town very challenging. Work began in summer of 2016 was completed late summer 2016.
The project involved substantial earthwork to construct an extensive underground storm water management system along with the installation of a state of the art new multi-sport synthetic turf surface. Included in the conversion were new football goal posts and soccer goal systems.
This publicly bid project involved the renovation of existing NCAA Division III multisport stadium. The project commenced in May of 2014 and was completed in August of 2014.
The project involved the replacement of existing synthetic turf and track surfacing with custom color blue, reconfiguration of the D-zones, addition of new trench drain, black vinyl coated fence and gates, new goal posts, all new in-ground equipment, decorative paver walkway and retaining walls along with the turnkey construction of an additional synthetic turf speed and strength training area adjacent to the field.
This Danville Area School District elected to award this project directly utilizing the KPN Cooperative Purchasing Program in lieu of going through the standard public sealed bid process. The complete turnkey stadium renovation was completed in 2017.
The state of the art stadium renovation process included a new multipurpose synthetic turf field, new asphalt base for track configuration, new all-weather polyurethane outdoor running track surface, fencing and a ball stopper safety netting system. The project required substantial earthwork and an extensive underground storm water management system with a PVC lined loop drain to protect against sink-holes that are prone in this region due to underlying limestone geology in the area.